Kitchen Remodeling · New London County, CT

Kitchens done right,down to the studs.

You've had the board saved for three years. You already know the layout you want. What's stopping you isn't the design, it's the number, the weeks without a kitchen, and whether the guy finishes. All three of those are answered below.

  • Majority Veteran Staff
  • CT HIC.0651499
  • Free Written Quotes
What Six Weeks Actually Looks Like

Nobody tells you aboutthe five weeks in the middle.

Every contractor will show you the after photo. Almost none of them will tell you what February looks like from your dining room, eating off a card table with the fridge in the hallway. Here's the whole thing, week by week, including the parts nobody photographs.

One thing worth knowing before week one: some walls can't come out. If the drawing you've saved needs a wall gone, we'll tell you on the first visit, not in week three.

  1. 01Week one Demo Loud, dusty, and fast. Your kitchen is gone by Friday. We plastic off the openings and run an air scrubber, but this is the week the dust wins a few. Kitchen out of service from here
  2. 02Week two Rough-In Plumbing and electrical move to wherever the new layout wants them. Most of what's in a 1970s kitchen isn't legal to leave, so a lot of this week is bringing the invisible parts up to code. The town signs it off before anything gets covered. Looks like nothing is happening. It's the week that decides whether the rest works.
  3. 03Week three Close It Up Insulation, drywall, tape, mud, sand, prime. Floors go in. It finally starts looking like a room again instead of a crime scene.
  4. 04Week four Cabinets The good week. The thing you spent three years choosing shows up in week four, and everything before it is the reason it fits. Boxes up, doors on, and you can finally see it. Then we template the counters, which is where the waiting starts.
  5. 05Week five The Wait Counters get fabricated off-site. Nothing we do makes this faster, and any contractor promising you otherwise is about to be late. Usually ten to fourteen days from template. We use it to finish trim and paint. The week people get frustrated
  6. 06Week six Done Counters set, sink and appliances hooked up, backsplash, hardware, punch list. You cook dinner in it that night.
The part everybody leaves out You're eating standing up for about five weeks. There's no version where you aren't.

Before demo we set up a real temporary station somewhere sane, with the fridge, the microwave, the coffee maker and a sink you can actually reach. It doesn't make it fun. It makes it survivable. Anyone telling you a kitchen is a two-week job is either not doing the rough-in or hasn't ordered the counters yet.

Get My Timeline In Writing
Where The Money Goes

We won't put a price on a website.We'll show you the shape of it.

Your kitchen isn't a website, so a number here would be a lie. The proportions aren't. This is roughly how any kitchen breaks down, and knowing it is how you decide what to change when the number comes back bigger than you hoped.

  • Cabinets Spend here. It's the thing you touch a hundred times a day and the first thing that dates. This is where a cheap kitchen tells on itself in year six. 35%
  • Labour This is the line that varies most between quotes, and it's usually the reason one of them is cheaper. Ask what's in it. 22%
  • Appliances Save here if you're saving anywhere. The expensive range does not cook better. It looks better, and you can buy that later when you feel like it. 14%
  • Counters Quartz or granite is taste, not quality. Neither one is the wrong answer, and the fabricator's schedule costs the same either way. 12%
  • Plumbing & Electrical Never save here. It's the smallest slice and it's behind the wall forever. Every dollar cut out of this one is a dollar you pay back with interest. 9%
  • Floor, Tile, Paint The easiest things to change later, and the easiest place to trim now if the number's tight. 8%
Why we're telling you this Because the first quote is always too big, and that's the moment people quit.

It doesn't have to be. Move the appliances down, keep the cabinets, never touch the mechanicals, and the same kitchen fits a smaller number. We'd rather have that conversation with you than watch you put it off another three years.

Get My Real Number
Kitchen Questions

The ones nobodywants to answer.

Three of these have answers that cost us money. They're here anyway, because you're going to find out eventually and we'd rather it was now.

Ask us anything If it's not here, it's not a stupid question. It just means nobody's asked it lately. Call Now (860) 743-2556 Get My Kitchen Quote

Sometimes, and if that's the right answer we'll say so. Refacing sound boxes in a layout that works is real money saved.

But if the layout is the problem, refacing gives you a nicer-looking version of the kitchen you already don't like. Doors don't move a sink.

It depends on the size, whether walls or plumbing move, and what you pick for cabinets. Anyone giving you a number over the phone is guessing.

Look at the breakdown above and you'll know the shape of it. Then we come measure, and you get a real number in writing. Free, and yours to keep.

About five weeks. Six start to finish, and the kitchen is gone from Friday of week one.

There's no version where that's shorter, because counters take ten to fourteen days to fabricate and nobody can speed that up. We set up a real temporary station before demo so you're not living out of a cooler.

We'll do the layout. Bring whatever you've saved and we'll tell you what works, what doesn't, and what it'd cost to make the bit you love actually happen.

If you've already got a designer, that's fine too. We'd rather build somebody else's good plan than talk you out of it.

Appliances, absolutely. Buy them wherever they're cheapest and we'll install them.

Cabinets we'd rather supply, and not for the margin. When a box arrives damaged or short, it's on us to fix and the schedule doesn't move. When it's your order, you're the one on the phone for three weeks.

Depends what and when. Changing a tile in week three is a conversation. Moving a sink in week three is a change order, and you'll hear the number before we touch anything.

This is exactly why step one is layout on paper. Everything is free to change until it isn't.

Yes. Any kitchen that moves plumbing or electrical needs one, and we pull it and book the inspection.

The rough-in gets signed off before anything is covered. That signature is what makes it your kitchen instead of the next owner's problem.

You hear about it that day, with a photo and a number, before we go any further.

On a house over forty it's usually old wiring or a drain that was never quite right. It's rarely a disaster. It's always cheaper to know in week two than to find out in year five.

Kitchen Service Area

Close enough toshow up every single day.

A kitchen doesn't get finished by a crew that bounces between counties. It gets finished by people who are twenty minutes out and have nowhere else to be. That's the whole reason we work a thirty mile circle, and it's why week five doesn't turn into week eleven.

Kitchen Remodeling in New London County

Ask about yours
  • Gales Ferry
  • Groton
  • Mystic
  • Ledyard
  • New London
  • Norwich
  • Waterford
  • Stonington
  • Pawcatuck
  • East Lyme
  • Niantic
  • Old Lyme
  • Montville
  • Uncasville
  • Oakdale
  • Quaker Hill
  • Preston
  • North Stonington
  • Griswold
  • Jewett City
  • Lisbon
  • Bozrah
  • Salem
  • Colchester

Sitting just outside the line? Ask anyway. The answer is usually yes.

Get My Kitchen Quote